PROJECTEnquire ↗
← All industries

Industries / Water and auxiliary systems

Water & environmental systems

Flow and level measurement, piping units and water-treatment equipment. Selected for fluid composition, operation and maintenance.

The whole application matters.

Clean water, industrial wastewater and water carrying solids present different conditions. Measurement and process-equipment selection starts with fluid analysis, hydraulics and the required outcome. Water treatment first requires defined inlet quality, target parameters and arrangements for secondary streams.

Water: intake, treatment, storage and distributionPROCESS MEASUREMENTINLETWATERWATERTREATMENTSTORAGEDISTRIBUTIONSIDESTREAM
Conceptual overview of supply areas; equipment, connections and verification are defined for the individual project.

From operating need to design.

01

Dependable process measurement

Flow-meter selection considers conductivity, full-pipe conditions, velocity and installation constraints. Level measurement considers foam, condensation, sediments and internal obstructions.

02

Materials and fouling

Solids and chemical composition determine materials, liners, electrodes and cleaning methods. Maintenance access is part of layout design.

03

A defined treatment outcome

Technology performance relates to inlet conditions and required outlet quality. Sampling and testing requirements belong in the brief.

A scope you can specify.

Inputs that matter.

  • Water analysis and variation in composition
  • Minimum, normal and maximum flow rates
  • Required outlet parameters and intended water use
  • Layout, pressure conditions and available utilities
  • Operation, staffing, cleaning and waste-handling arrangements
Prepare your brief →

Outputs and acceptance.

  • Justified equipment selection and defined conditions
  • Supply and installation of the agreed process package
  • Verification records and operating documentation

The actual scope and acceptance criteria depend on the application and contract.

Expertise for this application.

Questions that shape the project.

Is the required flow rate enough for a quotation?

It can support an initial discussion. Design also needs water composition, target quality, pressure conditions and operating modes.

Is every item suitable for drinking water?

Suitability for drinking-water contact is checked separately against the materials, specific product and requirements at the installation location.

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz