Materials, procedures, inspections and records belong in the brief from the beginning. We define what will be checked, who is responsible and which evidence accompanies the supply.

Discuss qualification requirements ↗

Quality follows the work.

  1. 01

    Requirements and inspection planning

    We first define the equipment function, operating conditions, materials, critical dimensions and documentation scope. The inspection plan sets acceptance criteria, responsibilities and points requiring customer or inspector attendance or approval.

  2. 02

    Supplier selection and technical clarification

    Technical proposals are checked against the required parameters and supply scope. Deviations, interfaces, qualification evidence, tests, documents and schedule dependencies are clarified before ordering.

  3. 03

    Receipt of materials and components

    Incoming inspection checks quantity, identification, specification, delivery condition and accompanying records. Traceable materials retain a link between the item and its material document; PMI can be added where specified.

  4. 04

    In-process fabrication and assembly checks

    The inspection plan covers dimensions, tolerances, joints, surfaces, markings and assembly completeness. Welding is followed by the specified examination and NDT. Nonconformities and changes are recorded and addressed before the next step.

  5. 05

    Testing and factory acceptance

    FAT may combine document review with dimensional, functional, pressure or calibration tests. Conditions, criteria and participant roles are agreed in advance. The acceptance record captures results and any remaining actions.

  6. 06

    Verification after installation

    After installation, connections, alignment, wiring, signals and functional interfaces are verified as required. Site tests and applicable inspections take account of surrounding equipment and the operator’s conditions. Changes are reflected in the documentation.

  7. 07

    Handover, documentation and follow-up service

    Handover reviews the agreed documents, test results, operating and maintenance instructions and any open items with owners and due dates. Training, spare parts and service arrangements are defined for the equipment and contract.

The right qualification for the scope.

Competence requirements are defined for the product and activity. For the selected manufacturer or specialist, the relevant qualification and authorisation scope and required supporting records are checked against the project.

Welded carbon-steel and stainless-steel assemblies

People and competence

Welders qualified for the process, material, joint type and dimensional range, with assigned welding coordination. Specified NDT requires personnel qualified for the relevant method and level.

Procedures and requirements

Selection of WPS and procedure-qualification evidence for the product, consumable control, weld traceability and an inspection plan. ISO 9606, ISO 15614, ISO 14731 and ISO 9712 are applied as relevant to the activity and specification.

Records to verify

Required WPS/WPQR, verification of qualification validity and coverage, material records, weld records and dimensional or NDT reports.

Load-bearing structural steelwork

People and competence

The responsible structural designer, manufacturer and installation team, with welding coordination and inspection personnel appropriate to the manufacturing route and execution class.

Procedures and requirements

Definition of structural function, product requirements, design responsibility, execution class, tolerances and corrosion protection. For products within EN 1090, the relevant manufacturer’s factory-production-control scope is checked.

Records to verify

Fabrication and erection documents, material and welding records, inspection reports and product-conformity documents under the applicable requirements.

Pressure vessels, piping and valves

People and competence

A designer and manufacturer responsible for the defined scope, qualified joining and testing personnel and, where required by the equipment category, the relevant inspection or conformity-assessment body.

Procedures and requirements

Definition of the fluid, design conditions, category and conformity-assessment route. Relevant equipment requires consideration of PED, permanent-joint qualifications, material traceability and an approved pressure or leakage test plan.

Records to verify

Drawings and technical data, material records, joining documentation, test reports, applicable declarations and operating instructions.

Machinery, handling systems and automated assemblies

People and competence

Mechanical, electrical and controls engineers, an integrator and functional-verification personnel. Responsibility for the safety and conformity of the completed assembly is assigned according to the scope of supply.

Procedures and requirements

A functional specification, defined interfaces and risk assessment, for example using ISO 12100. Protective measures and verification of operating and safety functions then address the assembly and its interfaces with surrounding equipment.

Records to verify

Functional descriptions, drawings and diagrams, applicable risk-assessment documents, verification records, manuals and conformity documents reflecting the supplier’s defined role.

Electrical, instrumentation and controls; hazardous-area equipment

People and competence

Personnel competent for the activity, electrical or instrumentation engineers and, where applicable, a statutory inspection technician with a valid certificate covering the required scope. Supplier authorisation for work on regulated electrical equipment is checked separately where required. Hazardous-area work also requires suitable competence and supporting documents covering that environment.

Procedures and requirements

Verification of power supply, signal interfaces, wiring and measuring ranges. Regulated equipment requires checks of the necessary authorisation scope; hazardous-area applications require area classification, appropriate equipment protection and supporting documents.

Records to verify

Diagrams, instrument and signal lists, instrument settings, functional-test records and required inspection reports, plus applicable hazardous-area documents and installation conditions.

Site installation, shutdowns and service

People and competence

An installation supervisor and trade specialists suited to the work, with personnel competent to use the required handling and installation equipment. Preparation includes site conditions and interfaces with the customer’s operations.

Procedures and requirements

Definition of the work area, access, equipment isolation and handover, trade interfaces and work sequence. Inspection points and tests are incorporated into the shutdown programme and site permit requirements.

Records to verify

An installation method and programme appropriate to the scope, inspection and change records, post-installation tests, as-built information and a handover or service report.

Certification and defined scopes.

EMKO PROJECT qualification resources for manufacturing, installation, service and project delivery. Each document includes its specific scope, dates and a downloadable PDF.

TIČR · E2A / E2B

Installation, repair and statutory inspection of reserved electrical equipment

EMKO PROJECT authorisation for equipment up to 1 kV AC or 1.5 kV DC, including lightning and static electricity protection. E2A covers non-hazardous areas; E2B covers explosive atmospheres.

Document number
15955/26/EZ-M,O,R-E2A,E2B
Dates and conditions
Issued 18 August 2026. Valid for 10 years from the date the decision becomes legally effective. Public copy with private personal details removed.

ČSN EN ISO 9001:2016

Quality management system

Design, manufacture and servicing of instrumentation and process equipment; sale and design of technological equipment; supply and management of industrial automation.

Document number
1219/2024/SC/Q
Dates and conditions
The document states validity from 14 June 2024 to 13 June 2027.

ČSN EN ISO 14001:2016

Environmental management system

Design, manufacture and servicing of instrumentation and process equipment; sale and design of technological equipment; supply and management of industrial automation.

Document number
1219/2024/SC/E
Dates and conditions
The document states validity from 14 June 2024 to 13 June 2027.

ČSN ISO 45001:2018

Occupational health and safety management system

Design, manufacture and servicing of instrumentation and process equipment; sale and design of technological equipment; supply and management of industrial automation.

Document number
1219/2024/SC/B
Dates and conditions
The document states validity from 14 June 2024 to 13 June 2027.

ČSN EN ISO 3834-2:2022

Quality requirements for fusion welding

Welding of instrumentation, process and technological equipment, steel structures and components. The annex specifies process 135 for material groups 1.1 and 1.4, and process 141 for group 8.1.

Document number
3012-COV-2023-1516-1
Dates and conditions
Issued on 10 November 2023; the document states validity until 9 November 2028 subject to the regular surveillance conditions.

EN 1090-1:2009+A1:2011

Factory production control for structural steel components

Structural steel parts, components, assemblies and structures up to execution class EXC3; declaration methods 2 and 3a within the document scope.

Document number
1544-CPR-2023-1516-1
Dates and conditions
Issued on 10 November 2023. Validity is conditional on the conditions stated in the document continuing to be met; no fixed expiry date is stated.

The summary reproduces the stated scope and dates. Current documents for the agreed activities form part of the qualification review.

The scope follows the product.

STO · PE 100

PE 100 hydrochloric acid storage tank

Technical construction assessment for a specific vertical, above-ground, self-supporting tank: 30 m³ working volume, hydrochloric acid up to 37%. This is a product-specific document.

090-068692 · 23 March 2026 to 23 March 2027.

View document · PDF · CZ ↗

Information that remains useful in operation.

The handover-document list is agreed at project start and developed to reflect the actual supply scope. The documents below apply according to equipment type, required tests and the supplier’s role.

01

Technical data and scope of supply

Equipment identification, key parameters, operating conditions, supply boundaries and agreed interfaces.

When applicable: For each assembly within the agreed project scope.

02

As-built documentation

Applicable drawings, layouts, isometrics, diagrams and approved changes in the agreed format and revision.

When applicable: After fabrication or installation, particularly where the final arrangement differs from the original design.

03

Material records and identification

Specified material documents, identification of traceable parts and links to supply items, with PMI records where required.

When applicable: Where the specification requires material evidence or traceability.

04

Welding documentation

Required WPS/WPQR, verified qualification coverage, weld records and associated inspection records.

When applicable: For welded products according to applicable requirements and the agreed inspection plan.

05

Dimensional inspection and NDT

Reports of specified dimensional, visual and other non-destructive examinations, identifying the component and result.

When applicable: For characteristics and joints specified by the drawing, applicable standard or inspection plan.

06

Pressure and leakage tests

Equipment identification, test medium, pressure, duration, conditions and result under the agreed procedure.

When applicable: For vessels, piping and valves requiring these tests.

07

Instrument calibration and settings

Measuring range, verified points, signal settings and agreed records, with an accredited calibration certificate where specified.

When applicable: For instrumentation within the required verification scope.

08

FAT and site functional tests

Test cases, conditions, results, acceptance attendance and open-item records, including their resolution.

When applicable: For assemblies whose acceptance includes functional or performance verification.

09

Electrical and control-system documents

Diagrams, instrument and signal lists, required inspection reports and agreed backups, versions and operating records for the control system.

When applicable: When electrical, instrumentation, controls or automation equipment is supplied or modified.

10

Product conformity and use documents

Applicable declarations, markings, manufacturer records and installation conditions, with pressure-equipment, structural or hazardous-area documents where relevant.

When applicable: According to the product, supplier’s role and applicable requirements.

11

Operating instructions, maintenance and spare parts

Operating instructions, agreed maintenance procedures, recommended spare parts and service information within the supply scope.

When applicable: For operation and maintenance of the supplied equipment.

12

Handover and training records

The accepted scope, document register, agreed training record and any remaining actions with due dates and responsible parties.

When applicable: At acceptance of the works or completion of a defined installation or service activity.

Practical guide to FAT, SAT and handover ↗

Instruments for inspection and service.

Flowmeter calibration line

Our flowmeter calibration line and DN 15 and DN 40 electromagnetic reference instruments support flow-instrument checks and calibration. Flow range, required uncertainty, connections and medium suitability are established for the instrument and configuration.

  • In-house flowmeter calibration line
  • DN 15 and DN 40 reference instruments
Instrument inspection and calibration ↗

Hydraulic pressure calibrator

Our hydraulic pressure calibrator supports pressure measurement tasks. The brief defines test points, permitted fluid, connections and the required output. Checks assess instrument response and, where specified, repeatability and hysteresis.

  • Hydraulic pressure calibrator
  • Pressure gauge and transmitter checks according to configuration
  • Measurement results and recorded test conditions
Instrument inspection and calibration ↗

Temperature calibrator

A temperature calibrator complements our facilities for checking and calibrating temperature measurement applications. The method follows the sensor or transmitter type, range and connection. The brief distinguishes individual instrument checks, signal simulation and verification of the complete measurement loop.

  • Temperature calibrator
  • Temperature instrument checks according to type and connection
  • Defined measurement points and results record
Instrument inspection and calibration ↗

Signal and level instrument checks

Facilities include a Keithley DMM6500 bench multimeter and equipment for checking displacer level instruments. Input simulation, output checks and tests in a process installation are distinguished when defining the task.

  • Keithley DMM6500
  • Displacer level instrument checks

VENTIL VC25SRV valve test bench

The bench combines gas and liquid systems with laser bubble counting for safety valve set-pressure and seat-tightness tests. The documented clamping range is DN 15–250; pressure, medium and fixtures are confirmed for each valve. A digital test report is supplied within the agreed scope.

  • VENTIL VC25SRV
  • DN 15–250 clamping, subject to connection
  • Gas / liquid (water)
  • Laser bubble counting
  • Digital test report
Safety valve service and testing ↗

PRÜFTECHNIK OPTALIGN Smart EX

Our laser shaft-alignment system supports installation and service of pumps, electric motors, gearboxes and other rotating equipment. It measures angular and parallel misalignment and determines the corrections needed to align the machinery.

  • Laser alignment of horizontal and vertical machines
  • Machine foot-contact checks (soft foot)
  • Measurement and alignment reporting
Rotating machinery service and alignment ↗

Which verification and document to request

Acceptance testing, calibration, statutory inspection and conformity assessment serve different purposes, so agree their scope and expected documents before supply.

On a small screen, scroll the table sideways to compare the selection criteria.

Which verification and document to request
Principle or optionTypical applicationWhat to agree and which output to expect
FAT: factory acceptance testVerification of agreed functions and requirements before shipment, for example for a control system or assembly.Approved procedure, criteria and simulated interfaces; the output records results, deviations and open items within the tested scope.[1]
SAT: site acceptance testVerification after installation, considering actual connections and agreed operating conditions.Site and utility readiness, interfaces and criteria; the output is a site test record and a list of outstanding actions.[1]
CalibrationEstablishing the relationship between instrument indication and reference values under specified conditions.Measurement points, traceability and uncertainty; the output reports calibration results, not adjustment or an automatic pass/fail decision.[2]
Statutory inspection, e.g. electrical equipment in CzechiaAssessment of equipment safety within the scope of applicable requirements.Equipment type and extent, documentation and inspector qualification; the output is an inspection report with findings and a conclusion on the inspected condition.[3]
Product conformity assessmentDemonstrating compliance with applicable legal requirements before placing a product on the market or putting it into service.Applicable legislation and procedure; the manufacturer prepares technical documentation and the relevant declaration, with notified-body involvement where the required procedure calls for it.[4]
Sources for this comparison
  1. IEC 62381:2024 – Factory, site and integration acceptance tests ↗
  2. BIPM / JCGM VIM – Calibration, clause 2.39 ↗
  3. e-Sbírka – Nařízení vlády č. 190/2022 Sb., aktuální znění ↗
  4. European Commission – Manufacturers and conformity assessment ↗

Reviewed on 18 October 2026. Selection is confirmed for the specific operating conditions and equipment design.

Inspection within a concrete supply.

All projects ↗
Project photograph.

Project 218 · Measurement & instrumentation

Variable-area flowmeters with flow switching

Recipient location: Dubai, United Arab Emirates · 2024

37 rotameters in three configurations, including flow switching and an outgoing instrument inspection.

Broader project portfolioInstrument and component supply

37 rotametersDetails →
AI illustration.

Project 1136 · Process plant upgrades

HCl measuring vessel replacement

Location: Rybitví, Czechia · June 2026

A new PP-H measuring tank, four ball valves, a level gauge and installation, with a documented 48-hour watertightness test.

EMKO PROJECTProcess equipment refurbishment and installation

Ø 1,200 × 2,000 mmDetails →
Project photograph.

Project 1245 · Shutdowns & maintenance

Autoclave filter screen replacement

Location: Pardubice, Czechia · 2026

Shutdown installation of 80 autoclave dewatering screens, including associated installation work.

EMKO PROJECTShutdown maintenance and repairs

80 dewatering screensDetails →

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz