Handling and conveyors
Buffers, roller and chain conveyors, transfer units, lifts and manipulators. Part geometry and weight, cycle time, positioning and workstation interfaces determine the design.
PROJECTEnquire ↗Engineering discipline
Handling and conveyor systems connected to production control. We coordinate mechanical design, electrical installations and automation as parts of one system.
Practical applications
Buffers, roller and chain conveyors, transfer units, lifts and manipulators. Part geometry and weight, cycle time, positioning and workstation interfaces determine the design.
PLC control, operator visualisation, drive signals and measurement points. A functional specification covers automatic cycles, manual modes, faults and recovery after interruption.
Control upgrades or additional mechanical stations while retaining required production interfaces. Program access, network interfaces and the commissioning approach are checked first.
From the brief to handover
Define the production flow, operating modes, cycle time, signals and exceptional states. Establish safety interfaces and acceptance criteria.
Coordinate mechanics, electrical systems, sensors and programming. Record interfaces in drawings, I/O schedules and the test plan.
Check assemblies and functions, simulate available signals and perform agreed factory acceptance tests.
Verify signals, movement directions and cycle interfaces. Test with plant operations, train users and hand over current backups.
For the quotation
For operation and maintenance
The agreed offer specifies the actual documents, tests and supply boundaries.
Technical preparation
We plan the work sequence, equipment and specialist team for the project. The proposal links each activity to its schedule, responsible contractor and required qualification records.
Relevant experience
Project 526 · Handling & automation
Installation location: Mladá Boleslav, Czechia · 2023–2025
Two gantry manipulators, conveyor interfaces and battery flow control for automotive production in Mladá Boleslav. The reference covers handed-over engineering and partial delivery stages.
Broader project portfolioEngineering and partial delivery stages
Project 422 · Handling & automation
Location: Mladá Boleslav, Czechia · 2023–2024
Mechanical transfer stations, cross transfers and new control functions for moving sequenced trolleys between production halls in Mladá Boleslav.
Broader project portfolioEngineering and delivery milestones
Go into detail
Before we start
We first check the platform, source programs, backups, licences and customer standards. These establish the integration scope or the need for an upgrade.
An acceptance cycle time needs defined parts, operating modes, input conditions and adjacent equipment. The criteria are agreed in the functional specification and verified during testing.
Where requested, access is designed with the operator’s network administrator. Permissions, security and service arrangements are agreed separately.
Your next project
Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.
Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz