PROJECTEnquire ↗
← All services

Engineering discipline

Piping systems & maintenance

Valves, piping components, installation packages and shutdown maintenance. We connect equipment, replace worn parts and coordinate the return to operation.

The task determines the scope.

01

Piping connections

Connections between tanks, pumps and process units. Materials, piping classes, joints, supports and interfaces are defined for the medium and operating conditions.

02

Valves as functional assemblies

Isolation and control valves, actuators and feedback. Material, function, control and failure behaviour matter alongside nominal diameter and pressure rating.

03

Shutdowns and maintenance

Replacement of piping, worn parts and process assemblies; pump and fan maintenance, alignment and inspection measurements. Work follows the plant’s isolation and worksite handover arrangements.

04

Valve automation and service

Complete pneumatic, electric or hydraulic actuator assemblies, automation of suitable existing valves and control upgrades. The supply combines installation, setting, feedback, functional testing and maintenance information.

Available scope

  • Piping components, prefabrication and actuated valves
  • Installation, dismantling and reconstruction
  • Shutdown maintenance of pumps, fans, tanks and piping
  • Replacement of screens and worn parts, equipment alignment and verification measurements

Connected work. Clear checkpoints.

  1. 01

    Survey and scope

    Verify actual conditions, media, access, connection points and replacement part requirements.

  2. 02

    Intervention planning

    Prefabrication, dismantling and tie-in plans, material readiness, handling and discipline coordination.

  3. 03

    Installation or repair

    Execute the work to the approved method and operator’s conditions. Check joints, alignment and installation interfaces during the work.

  4. 04

    Testing and return to service

    Agreed tightness or functional checks, documentation and handover with the operator. Test requirements are specific to the equipment.

What to prepare.

  • Medium, material, nominal diameter and operating and design conditions
  • P&ID, isometrics, drawings and affected equipment list
  • Required valve, actuator and feedback functions
  • Access, weights, handling and connection condition
  • Shutdown date, concurrent work and operator coordination
  • Inspection, testing, spare part and documentation requirements
Build a technical brief →

What we agree to hand over.

  • Installed or repaired assembly within the contract scope
  • Material and installation records appropriate to the equipment
  • Agreed test and functional records
  • Alignment or measurement reports where required
  • Updated information for operation and maintenance

The agreed offer specifies the actual documents, tests and supply boundaries.

Resources matched to the work.

We plan the work sequence, equipment and specialist team for the project. The proposal links each activity to its schedule, responsible contractor and required qualification records.

Equipment and tools

  • Piping and welding equipment matched to the material and joint
  • Lifting and assembly resources, torque and alignment tools
  • Equipment for tightness, valve function, geometry and process measurement checks
Technical facilities ↗

Competence and verification

  • Welding and inspection qualifications for the piping system
  • Personnel competence and authorisations appropriate to regulated equipment and the activity
  • Handling, work-at-height and site-specific competence
Quality and qualifications ↗

From the project portfolio.

All projects ↗
Project photograph.

Project 116 · Valves & piping

Pneumatically actuated valves for gas processing

Export project region: Middle East · 2020–2022

150 assemblies in the project scope; 111 in documented completed stages. Pneumatic actuators, functional tests and export packing.

Broader project portfolioStaged valve and actuator supplies

150 assemblies in the technical project scopeDetails →
Project photograph.

Project 1245 · Shutdowns & maintenance

Autoclave filter screen replacement

Location: Pardubice, Czechia · 2026

Shutdown installation of 80 autoclave dewatering screens, including associated installation work.

EMKO PROJECTShutdown maintenance and repairs

80 dewatering screensDetails →

Related technologies and resources.

Technology

Valves, actuators and control assemblies

↗
Technology

Piping systems and installation interfaces

↗
Technology

Process equipment and skid assemblies

↗
Technology

Rotating machinery service and diagnostics

↗
Technology

Belt and chain drives

↗
Technology

Laser centre: cutting, marking, cleaning and welding

↗
Technology

Methanol production from waste gas

↗
Technology

Refurbishment of process equipment packages

↗
Technology

Automated shut-off and safety valves

↗
Technology

Pilot unit for wet-process phosphoric acid

↗
Technology

Statutory inspections, repair and maintenance

↗
Technology

Process instrument checks and calibration

↗
Technology

Metal and plastic welding

↗
Technology

Fuel storage and loading terminals

↗
Technology

Fixed fire suppression systems

↗
Technology

Compressed air, nitrogen and process cooling

↗
Technology

Industrial emission reduction

↗
Technology

Gas detection and plant alarms

↗
Technology

Electric heating and heat tracing

↗
Technology

Industrial and emergency lighting

↗
Technology

Steam and condensate systems

↗
Technology

Industrial gaskets and flanged joints

↗
Technology

Thermal insulation and steam tracing

↗
Technology

Bulk material conveying and dosing

↗
Technology

Pressure vessels, storage tanks and accumulators

↗
Technology

Heat exchangers and thermal equipment

↗
Technology

Industrial filtration and separation

↗
Technology

Clariphex membranes and filtration units

↗
Technology

Safety valve service and testing

↗
Technology

Rupture discs and pressure relief

↗
Technology

Automated storage systems

↗
Technology

Mobile robotic material transport

↗
Technology

Electric vehicle charging

↗
Practical guide

Specifying valves and actuators

↗
Practical guide

Preparing an industrial shutdown

↗
Practical guide

Agreeing FAT, SAT and handover documentation

↗

Questions that shape the project.

Can most work be prepared before the shutdown?

Many parts and assemblies can be prepared in advance once dimensions and interfaces are verified. Planning separates prefabrication from work that requires an isolated plant.

Is a pressure test included in every intervention?

The type, scope and parameters of testing depend on the equipment, applicable requirements and approved procedure. They are not universal across repairs or media.

Do you provide an emergency call-out service?

Availability and timing are confirmed for the particular requirement. A standard website enquiry does not establish round-the-clock cover or a guaranteed response time; any service level is agreed contractually.

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz