Engineering discipline

Industrial electrical installations

Power and control wiring for new equipment and upgrades to operating facilities.

The task determines the scope.

01

Connecting new equipment

Power supplies, cable routes, switchboards and interfaces to sensors, drives and control systems. Electrical and mechanical interfaces are developed together.

02

Upgrading an operating plant

Replacement and extension of installations with staged changeovers. The design depends on verified conditions, safe isolation and production interfaces.

03

Documentation and identification

Cable, terminal and equipment identification, updated schematics and schedules. Clear identification supports commissioning and subsequent maintenance.

04

Potentially explosive atmospheres

Electrical installation selection and coordination based on area classification and equipment conditions.

Available scope

  • Power and low-current installations
  • Cable routes and equipment connections
  • Switchboards and control system interfaces
  • Electrical reconstruction

Connected work. Clear checkpoints.

  1. 01

    Existing conditions

    Verify the power system, loads, environment, existing installation and available records.

  2. 02

    Design and preparation

    Define circuits, cable routes, protection, switchboards and control interfaces. Agree tests and the shutdown sequence.

  3. 03

    Installation and connection

    Install and label to the documentation, coordinating with mechanical work and plant operations.

  4. 04

    Verification and handover

    Inspections, measurements, functional verification and applicable statutory inspections within the agreed scope; update the records.

What to prepare.

  • Available single-line and wiring diagrams with revision status
  • Equipment list, loads and power supplies
  • Environmental, ingress protection and any hazardous area requirements
  • Routes, distances, penetrations and switchboard interfaces
  • PLC, sensor and communication network interfaces
  • Shutdown constraints and required documentation
  • Area classification and required equipment records where relevant.
Build a technical brief →

What we agree to hand over.

  • Installed and labelled circuits within the contract scope
  • Updated wiring diagrams and schedules
  • Results of required inspections and measurements
  • Statutory inspection reports and functional test records appropriate to the applicable requirements and scope
  • Information for operation and maintenance

The agreed offer specifies the actual documents, tests and supply boundaries.

Resources matched to the work.

We plan the work sequence, equipment and specialist team for the project. The proposal links each activity to its schedule, responsible contractor and required qualification records.

Equipment and tools

  • Cable installation and assembly tools matched to the conductors and installation method
  • Electrical installation test instruments with appropriate traceability
  • Configuration and diagnostic tools for the specified drives and control systems
Technical facilities ↗

Competence and verification

  • Personnel competence and supplier authorisation appropriate to the electrical equipment
  • Statutory inspections carried out by an inspection technician holding a valid certificate for the relevant scope
  • Additional assessment of zones, equipment and installation methods in hazardous areas
Quality and qualifications ↗

From the project portfolio.

All projects ↗
Project photograph.

Project 526 · Handling & automation

Automated battery storage project

Installation location: Mladá Boleslav, Czechia · 2023–2025

Two gantry manipulators, conveyor interfaces and battery flow control for automotive production in Mladá Boleslav. The reference covers handed-over engineering and partial delivery stages.

Broader project portfolioEngineering and partial delivery stages

2 gantry manipulators with three axes of motionDetails →
Project photograph.

Project 422 · Handling & automation

Conveyor extension and material-flow control

Location: Mladá Boleslav, Czechia · 2023–2024

Mechanical transfer stations, cross transfers and new control functions for moving sequenced trolleys between production halls in Mladá Boleslav.

Broader project portfolioEngineering and delivery milestones

2 new workstations in the technical scopeDetails →

Related technologies and resources.

Questions that shape the project.

Can electrical work be part of the mechanical supply?

Yes. Power, control and safety interfaces, supplier responsibilities and tests of the complete assembly are defined during preparation.

What if the documentation differs from the plant?

The actual installation must be verified before work starts. The enquiry can include surveys and documentation updates.

Does the supply automatically include statutory inspection?

Required checks, measurements and statutory inspections are determined by the equipment, the work performed and the applicable requirements. The proposal identifies which activities are arranged by the supplier, the customer or another authorised party, together with the records to be provided.

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz