PROJECTEnquire ↗

Practical resources

A better brief makes decisions easier.

Eight practical guides to selecting equipment, preparing a shutdown and defining handover. Use the checklists to collect the information available in your plant.

Prepare a technical brief ↗
Cover of the EMKO PROJECT company brochure

Meet EMKO in eight pages.

A concise introduction to our services, in-house design, manufacturing facilities and qualifications, with six selected project references, photographs and contact details.

Download brochure in Czech ↓

PDF · 8 A4 pages · 5.7 MB · Czech · October 2026

For a meeting, printout or sharing by email.

01
Process measurement & instrumentation

Preparing a flow measurement specification

A suitable flowmeter depends on the medium, operating conditions and measurement purpose. The same pipe size may require different equipment for process indication, batching or accurate consumption monitoring.

Input checklist · Deliverables · Common questions
02
Process measurement & instrumentation

Specifying tank level measurement

First decide whether the application needs level, volume, an interface between two liquids or a limit signal. The measurement principle and sensor position follow from that purpose.

Input checklist · Deliverables · Common questions
03
Piping systems & maintenance

Specifying valves and actuators

Nominal size and pressure rating are only the starting point. A valve must suit the medium, actual pressure conditions, control arrangements and process function, including its behaviour during a fault.

Input checklist · Deliverables · Common questions
04
Piping systems & maintenance

Preparing an industrial shutdown

A short shutdown needs preparation well in advance. Clear scope, available parts and agreed site handover expose dependencies before production stops and the limited work window begins.

Input checklist · Deliverables · Common questions
05
Industrial automation

Assessing a conveyor and controls retrofit

A retrofit should address a defined operating problem: obsolete parts, unstable operation, a different product or integration with other equipment. Replacing the controller is only one part of that decision.

Input checklist · Deliverables · Common questions
06
Custom manufacturing

Specifying a custom weldment or tank

A useful specification describes function, environment and acceptance. A drawing showing only external dimensions is generally insufficient to determine material, welded joints, tolerances and inspection requirements.

Input checklist · Deliverables · Common questions
07
Integrated project delivery

Agreeing FAT, SAT and handover documentation

Acceptance should verify requirements agreed in advance. Defining tests and records only at handover can create disagreement about what the delivery was actually meant to include.

Input checklist · Deliverables · Common questions
08
Process measurement & instrumentation

Specifying negative pressure wave leak detection

NPW uses a pressure disturbance travelling along a pipeline when a leak develops. It is one monitoring method; suitability and achievable performance must be evaluated for the particular pipeline and operating conditions.

Input checklist · Deliverables · Common questions

Build a brief for your project.

Select a discipline and work through its key questions. You can copy or download the resulting brief, or transfer it to the enquiry form for a final review before submission.

Open the brief builder ↗

No registration required. Your brief is prepared in this browser.

Check the numbers before the brief.

Convert a linear 4–20 mA signal, calculate mean flow velocity from the actual pipe diameter or determine the volume of a cylindrical vessel section. Units, formulas and assumptions are shown with every tool.

Open the calculators ↗

Understand the specification.

DN and PN, calibration and adjustment, WPS and WPQR, FAT and SAT. Explore 28 practical definitions with guidance for your brief and links to technical sources.

Open the glossary ↗

Documents available to download.

TIČR E2A/E2B, ISO 9001, ISO 14001, ISO 45001, ISO 3834-2, EN 1090 and product documentation.

Open document library ↗

Keep the complete portfolio at hand.

80 reference sheets with photographs or labelled illustrations, defined scopes of work and available financial bands. Individual sheets can also be downloaded from each project page.

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.