01
Understand the principle and data requirements
A developing leak can create a negative pressure wave travelling in both directions. Fast pressure measurements capture the event, and arrival-time differences help estimate its position. Results depend on wave propagation, sensor quality and timing. Ordinary low-rate historical trends may not contain the information needed for accurate analysis of the event.
02
Separate leaks from operating transients
Pump and valve operations also produce pressure changes. Analysis must distinguish operating events from suspected leaks while considering branches, product changes and multiphase flow. A slowly developing or existing leak may not provide the same signal as a sudden rupture. Combining NPW with balance-based or model-based monitoring may therefore be appropriate.
03
Make performance part of acceptance
Engineering defines measurement points, dynamic response, synchronisation, communications, data retention and control-room interfaces. Sensitivity, detection time and location accuracy are not universal constants. A pilot recording of real operations helps evaluate assumptions. Also specify acceptable nuisance alarms, behaviour during communication failures and responsibility for operator response.
Expected engineering outputs
- Assessment of NPW suitability and complementary methods.
- Measurement, data and operational alarm architecture.
- Project targets and a safely planned verification programme.
Technical sources and further reading
- Atmos International – Atmos Wave ↗
- PSI – PSIpipelines ↗
- Atmos International – AWAS units ↗
- Atmos International – Gathering networks considerations ↗
- Atmos International – Rising sewer mains ↗
- Atmos International – Leak sensitivity pilot ↗
Reviewed on 18 October 2026. Product limits and applicable requirements are confirmed for each specification.