Project objective
Translate existing production requirements into a new control architecture and define interfaces to field instruments, safe shutdown and plant operation.
PROJECTEnquire ↗Offered technologies / Process plants
Preparation of a control-system replacement covering PLC/DCS architecture, signal interfaces, cabinets, operator stations, application software and a functional test plan.
Operating context
Design starts by checking the signal list and functional requirements. Redundancy, power supplies, remote inputs and outputs, marshalling cabinets and visualisation are then selected. Hardware, software and documentation are prepared with a specialist integrator; installation, cabling and commissioning scope is agreed for the individual plant.
Engineering priorities
Translate existing production requirements into a new control architecture and define interfaces to field instruments, safe shutdown and plant operation.
Verified signal list, voltage levels and hazardous-area requirements.
Functional specification, diagrams, signal lists, configurations and agreed software documentation.
Before engineering
Agreed with the proposal
The actual scope and acceptance criteria depend on the application and contract.
From technical proposal preparation
These examples describe proposed solutions and enquiry requirements. Their parameters belong to the stated project stage; completed supplies are shown separately in the project portfolio.
Project 0112 · 2020 · Middle East
Translate existing production requirements into a new control architecture and define interfaces to field instruments, safe shutdown and plant operation.
Design starts by checking the signal list and functional requirements. Redundancy, power supplies, remote inputs and outputs, marshalling cabinets and visualisation are then selected. Hardware, software and documentation are prepared with a specialist integrator; installation, cabling and commissioning scope is agreed for the individual plant.
The example configuration is based on a partner proposal for modernising formalin-plant controls. Hardware, licensing and responsibilities are updated before a new supply.
Discuss a similar application ↗Connected disciplines
Your next project
Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.
Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz