The project in context
Technology in its operating context.
The work was carried out in Czechia. The photographic record of the original measurement setup dates from 2025.
Scope of work
- Condensate level measurement
- Replacement of orifice-based measurement with a mass flowmeter
Execution
The original orifice-based measurement was replaced by a mass flowmeter; the scope also included condensate level measurement.
Completed scope
The project covered condensate level measurement and replacement of orifice-based measurement with a mass flowmeter.
Original metering line
The photograph shows the original metering line before modification, documenting the initial setup in 2025.
Outcome
Condensate level measurement and the replacement of orifice-based measurement completed.