The project in context
Technology in its operating context.
Supply of piping components to connect a process unit to gas pipeline infrastructure. The scope included seamless pipes, flanges, fittings, branches and connecting parts. The shipment also included a DN900 insulating joint.
Scope of work
- Seamless pipes
- Flanges and pipe fittings
- Branches and associated connecting parts
Execution
Dispatch followed the allocation of piping components by size, material and shipping unit. The large insulating joint had its own packing list.
Materials for the gas pipeline connection
The piping lot included seamless pipes, weld-neck flanges, elbows, branches and associated connecting parts. The schedule distinguishes API 5L Grade B pipes, ASTM A105 flanges and large ASTM A694 F65 flanges.
Fittings included ASTM A234 WPB and ASTM A860 WPHY65 versions. Material and pressure class were specified per item, with a range of nominal sizes and connections in the supply.
DN900 insulating joint and logistics
A separate component was a DN900, or 36-inch, monolithic insulating joint in Class 900. Its specification lists API 5L X65 and ASTM A694 F65 materials. The net weight of this assembly was approximately 2.88 tonnes.
September 2020 shipping records divide the supply into 23 packages of piping components and one insulating-joint package. Packing schedules allocated items to shipping packages and, where applicable, identified their heat numbers.
Outcome
The documented result is a component supply for a gas pipeline connection in 24 shipping packages.