The project in context
Technology in its operating context.
Partial supply of instruments for process dehydration, gas compression and pipeline connections. The package contained 63 temperature and pressure gauges, including differential pressure measurement, and 11 level instruments. Spare parts complemented the individual instrument groups.
Scope of work
- 19 temperature gauges, 39 pressure gauges and 5 differential pressure gauges
- 8 magnetic level gauges and 1 glass level gauge
- 2 displacer level transmitters and spare parts
Execution
The coordinated instrument supply was divided into pressure and temperature measurement and a separate level-measurement lot. Outgoing invoices and packing records confirm the scopes.
Pressure and temperature: 63 instruments
The first lot comprised nineteen temperature gauges, 39 pressure gauges and five differential pressure gauges. The current packing list identifies ITEC instruments by process position.
Local indicators were intended for dehydration, gas compression and associated piping connections. The supply included spare parts for pressure and temperature instruments.
Level: eleven further instruments
The second lot contained eight magnetic level gauges, one glass level gauge and two displacer level transmitters. Spares for electric and non-electric level instruments were listed separately.
Together, the two 2025 deliveries comprised 74 main measuring instruments. Service parts were supplied in addition to this instrument count.
Outcome
The result is a partial supply of 74 main instruments with spares for process instrumentation.