PROJECTEnquire ↗
← All solutions

When the right replacement or assembly matters

Component supply with a verified specification

An ordering code starts the discussion but does not define the whole requirement. A suitable component must match the process, connections, signals and documentation.

The whole application matters.

For an instrument, valve or accessory, distinguish an exact replacement from a change in solution. A catalogue equivalent may differ in dimensions, material or output. Technical comparison therefore uses the decisive parameters rather than similar product names.

Large-diameter electromagnetic flowmeters — technical illustration
AI-generated illustration; it does not depict the actual delivered equipment. · Large-diameter electromagnetic flowmeters

From operating need to design.

01

Compatibility at the installation

Operating conditions, dimensions, connections and available space are reviewed. Measurement assemblies also require ranges, power and communication details; valves require defined duty, leakage requirements, actuation and feedback interfaces.

02

Offer comparison and deviations

An offer should separate compliance, exceptions and open questions. Accessories, mounting parts, document language and spares can determine usability just as much as the main item.

03

Acceptance and installation interfaces

Identification, quantity, document checks and any tests are agreed before shipment. Acceptance of a component does not by itself demonstrate performance after installation. Installation and subsequent verification need their own defined scope.

A scope you can specify.

Inputs that matter.

  • Datasheet, nameplate and reason for procurement.
  • Medium and actual operating conditions.
  • Connections, dimensions and signal interfaces.
  • Required accessories and documentation.
  • Delivery location, timing and inspection points.
Prepare your brief →

Outputs and acceptance.

  • Technical specification and deviation register.
  • Defined assembly including accessories.
  • Agreed acceptance records and item identification.

The actual scope and acceptance criteria depend on the application and contract.

From the project portfolio.

All projects ↗
Project photograph.

Project 116 · Valves & piping

Pneumatically actuated valves for gas processing

Export project region: Middle East · 2020–2022

150 assemblies in the project scope; 111 in documented completed stages. Pneumatic actuators, functional tests and export packing.

Broader project portfolioStaged valve and actuator supplies

150 assemblies in the technical project scopeDetails →
AI illustration.

Project 1156 · Custom manufacturing

Dosing screws and feeder housings

Project location: Pardubice, Czechia · August 2026

Four dosing screws and two twin-screw conveyor housings in grade 1.4541 stainless steel.

EMKO PROJECTCustom manufacture and supply

4 dosing screwsDetails →

Expertise for this application.

Questions that shape the project.

Is a photograph of the old nameplate enough?

It helps identify the original product but may omit process changes or a special configuration. Add the reason for replacement and installation information.

Is an alternative product always interchangeable?

No. Mechanical, process and electrical compatibility must be confirmed. Required modifications and deviations should be known before the order is placed.

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz