PROJECTEnquire ↗
← All projects

Valves & piping

Piping connections for a chemical process

Chemical-process piping connections covering nitrogen, venting, drainage and vacuum, with valve installation and handover.

Project: 1172Location: Rybitví, CzechiaPeriod: July 2026
Installation and service work

Supplier: EMKO PROJECT s.r.o.

AI-generated illustration; it does not depict the actual delivered equipment.

Technology in its operating context.

Supply and installation of piping connections for an existing chemical process in Rybitví. The scope connected nitrogen, vent, drain and vacuum lines with valves and interfaces to existing equipment; handover took place in July 2026.

Scope of work

  • Connections to an existing glass-lined kettle, column and filtration section
  • Nitrogen, vent, drain and vacuum lines
  • The brief specified DN 25–50 pipe branches and a 12 m DN 40 chemical hose
  • Material supply, installation and agreed testing and documentation scope

Connecting existing process equipment

The piping package supported modifications to a 3,5-DNBC process. The initial brief described an existing 3.2 m³ glass-lined kettle with an agitator, a glass column and filtration equipment. EMKO’s supply concerned their piping connections and the required valves.

The technical approach distinguished the media and materials of the individual branches. The brief included stainless and steel pipework, polypropylene sections and valves with protective linings.

Nitrogen, drainage and vacuum

For the nitrogen connection, the brief specified a DN 25 branch and pressure reduction from 0.6 to 0.05 MPa, among other items. The drain section included DN 50 pipework with a DN 25 branch and a 12 m DN 40 chemical hose. These figures describe specific requirements in the project brief.

The polypropylene connection between the filter and receiver was specified as DN 50 and 10 m long, with drain and vacuum valves. Further lines served the kettle and column vents.

Piping installation and handover

The invoiced scope separates material supply, installation, and an item for inspections, tests and documentation. The handover protocol dated 24 July 2026 confirms acceptance of the equipment and its suitability for continuous operation.

The supply connected existing process units. The stated nominal sizes and lengths describe the piping package as defined in the technical brief.

Outcome

Piping connections to existing process equipment handed over with installed valves and a defined inspection scope.

More projects in this field.

Project photograph.

Project 116 · Valves & piping

Pneumatically actuated valves for gas processing

Export project region: Middle East · 2020–2022

150 assemblies in the project scope; 111 in documented completed stages. Pneumatic actuators, functional tests and export packing.

Broader project portfolioStaged valve and actuator supplies

150 assemblies in the technical project scopeDetails →
Project photograph.

Project 115 · Valves & piping

De-oiling valves and instrumentation

Delivery region: Middle East · 2020

43 components for condensate de-oiling, plus a separate supply of six spare safety valves.

Broader project portfolioDispatch of process components

43 components in the main lotDetails →
Project photograph.

Project 121 · Valves & piping

Gas pipeline connection components

Delivery region: Middle East · 2020

Pipes, flanges and fittings for a gas pipeline connection, including a DN900 insulating joint.

Broader project portfolioDispatch of process components

DN900 insulating jointDetails →

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.