PROJECTEnquire ↗
← All projects

Valves & piping

Valve packages for polyethylene production

Partial supply of 352 valves in two shipping lots for high-density polyethylene production.

Project: 209Delivery region: Middle EastPeriod: 2024–2025
Partial valve deliveries

EMKO project portfolio. Supplier at the time of delivery: EMKO HOLDING s.r.o.

Valves and package components prepared for workshop assembly.

Technology in its operating context.

Partial valve deliveries for high-density polyethylene production comprised 352 pieces in two shipping lots. The scope combined butterfly valves, gate valves, ball valves, globe valves and needle valves. The separately priced deliveries formed part of the wider piping equipment for the project.

Scope of work

  • Butterfly valves, gate valves and ball valves
  • Globe valves and needle valves
  • Two separate shipping lots

Execution

The project combined coordination of different valve types and their partial shipments in 2024–2025.

Valve scope by function

The second supply lot comprised 207 gate valves, 110 butterfly valves, thirteen globe valves, twelve ball valves and three needle valves. This represented 345 units across 54 line items.

The first lot from 2024 comprised seven further butterfly valves. Together, the two supplies contained 352 valves for high-density polyethylene process piping.

Two separately invoiced deliveries

The first partial supply was invoiced in October 2024 and the second in May 2025. The records distinguish valves by type and item codes for their respective configurations.

The financial band applies to these two direct supplies. The reference covers component packages within a wider process project.

Outcome

The documented scope is 352 valves in two supply lots.

Photograph from the project.
Batch of valves forming part of the polyethylene-production package.
Detail of valves after coating.
Flanged valve package prepared in the workshop.

More projects in this field.

Project photograph.

Project 116 · Valves & piping

Pneumatically actuated valves for gas processing

Export project region: Middle East · 2020–2022

150 assemblies in the project scope; 111 in documented completed stages. Pneumatic actuators, functional tests and export packing.

Broader project portfolioStaged valve and actuator supplies

150 assemblies in the technical project scopeDetails →
Project photograph.

Project 115 · Valves & piping

De-oiling valves and instrumentation

Delivery region: Middle East · 2020

43 components for condensate de-oiling, plus a separate supply of six spare safety valves.

Broader project portfolioDispatch of process components

43 components in the main lotDetails →
Project photograph.

Project 121 · Valves & piping

Gas pipeline connection components

Delivery region: Middle East · 2020

Pipes, flanges and fittings for a gas pipeline connection, including a DN900 insulating joint.

Broader project portfolioDispatch of process components

DN900 insulating jointDetails →

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz