Material compatibility, dependable measurement and carefully planned plant interfaces. For new process units and shutdown-led upgrades.

The whole application matters.

Chemical processes depend on the interaction of fluid composition, temperature, pressure and operating modes. We start with a clear process description and supply boundaries, linking instrument and valve selection to piping, vessel and seal materials, installation and inspection requirements. For retrofits, the existing equipment condition, safe site release and the available intervention window are equally important.

Acidification reactor replacement — project photograph
Photograph from the project. · Acidification reactor replacement

From operating need to design.

01

Aggressive and variable fluids

Wetted materials, seals and measurement principles depend on concentration, temperature and possible composition changes. A fluid name alone is insufficient for selection.

02

Existing plant interfaces

Connections, materials, supports, maintenance access, signals and interlocks are reviewed. Responsibilities are defined before components are ordered.

03

A prepared shutdown

Prefabrication, logistics and inspection points reduce work left until the shutdown. Isolation, cleaning and work-area release are agreed with the operator.

A scope you can specify.

Inputs that matter.

  • Fluid, concentration and possible contaminants
  • Operating and design pressures and temperatures
  • P&IDs, layouts, material specifications and connections
  • Area classification and operating safety requirements
  • Shutdown window, operator support and acceptance criteria
Prepare your brief →

Outputs and acceptance.

  • Equipment and installation within agreed boundaries
  • Inspection and test records to the agreed quality plan
  • As-built documentation and maintenance information

The actual scope and acceptance criteria depend on the application and contract.

From the project portfolio.

All projects ↗
Project photograph.

Project 667 · Process plant upgrades

Acidification reactor replacement

Installation location: Lovosice, Czechia · 2024

Replacement of a 3.9 m³ reactor on a +6 m platform, including agitator assembly and modification of 15 pipe runs.

Broader project portfolioEquipment replacement, installation and connection

1 reactor with a volume of 3.9 m³Details →
Project photograph.

Project 674 · Process plant upgrades

Vacuum system replacement

Location: Rybitví, Czechia · 2024

New vacuum assembly with PP tanks, heat exchangers, piping, instrumentation and controls.

Broader project portfolioProcess equipment refurbishment and installation

2 independent vacuum trainsDetails →
Project photograph.

Project 421 · Measurement & instrumentation

Radar transmitters for isopropanol production

Delivery region: Middle East · 2024

24 guided-wave radar level transmitters for a chemical process, including cable-probe components and flanges.

Broader project portfolioInstrument and component supply

24 radar level transmittersDetails →

Expertise for this application.

Questions that shape the project.

Can existing piping and connections be retained?

Yes, where a survey and technical assessment confirm their condition, compatibility and suitability for the new conditions. Required modifications are included in the scope.

How are hazardous areas addressed?

The operator’s area classification and requirements determine equipment, installation and competence needs. The required supporting records form part of the agreed scope.

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz