PROJECTEnquire ↗
← All projects

Process plant upgrades

Equipment refurbishment for functional colourants

Process-vessel refurbishment and preparation for integration into functional-colourant production, including piping and electrical interfaces.

Project: 1129Project location: Rybitví, CzechiaPeriod: 2026
Equipment refurbishment and process modifications

EMKO PROJECT s.r.o.

Perforated internals during refurbishment of equipment for functional-colourant production.

Technology in its operating context.

Introduction of functional-colourant production includes refurbishment of selected process equipment and its plant interfaces. The contractual scope covers two clarifying vessels, the TN34 pressure nutsche filter and a drum tipper, together with containment trays, pipework and electrical installation. The photographs document individual refurbishment operations and preparation for testing.

Scope of work

  • Refurbishment and relocation of selected process equipment
  • Two clarifying vessels, TN34 pressure nutsche filter and drum tipper
  • Containment trays, connecting pipework and electrical installation

Execution

Workshop work forms part of the refurbishment of existing vessels. The photographs show perforated internals and a vessel connected to a test pump during the refurbishment.

Process equipment refurbishment

The contractual scope includes refurbishment and relocation of two clarifying vessels, modification of the TN34 pressure nutsche filter and relocation of a drum tipper. Restoration of these items forms part of the introduction of functional-colourant production.

Piping, containment and electrical interfaces

The scope includes containment trays, connecting pipework and electrical installation associated with the equipment arrangement. The photographs document internals refurbishment and preparation of a vessel for testing.

Outcome

Individual vessel refurbishment operations and preparation for integration into the process installation. This reference covers the documented work on selected equipment.

Process vessel connected to a test pump during the work.

More projects in this field.

Project photograph.

Project 667 · Process plant upgrades

Acidification reactor replacement

Installation location: Lovosice, Czechia · 2024

Replacement of a 3.9 m³ reactor on a +6 m platform, including agitator assembly and modification of 15 pipe runs.

Broader project portfolioEquipment replacement, installation and connection

1 reactor with a volume of 3.9 m³Details →
Project photograph.

Project 674 · Process plant upgrades

Vacuum system replacement

Location: Rybitví, Czechia · 2024

New vacuum assembly with PP tanks, heat exchangers, piping, instrumentation and controls.

Broader project portfolioProcess equipment refurbishment and installation

2 independent vacuum trainsDetails →
Project photograph.

Project 692 · Process plant upgrades

Stainless steel tank with agitator

Installation location: Přerov, Czechia · 2024

A grade 1.4571 tank with an internal diameter of 1,950 mm, supplied in two sections and welded together during installation.

Broader project portfolioFabrication, installation and supply of a tank with agitator

1 tank with an agitatorDetails →

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz