For a new plant or process unit

A new process installation from brief to handover

A new installation needs a shared brief for process, equipment and controls. Early interface definition helps prevent changes during fabrication and installation.

The whole application matters.

Preparation starts with the duty, operating modes and available inputs. These inform the concept, balances and decisions needed before major equipment is ordered. The delivery approach follows project maturity and the responsibilities the customer retains.

Vacuum system replacement — project photograph
Photograph from the project. · Vacuum system replacement

From operating need to design.

01

Process and supply boundaries

Define what the package receives and delivers: media, product, utilities, data and waste streams. A licensed process also requires clear responsibilities for the technology provider and inputs to the other engineering disciplines.

02

Equipment and discipline coordination

Connection points, space, materials and signals must agree across the documents. Long-lead items are assessed early so procurement does not get ahead of essential technical decisions.

03

Acceptance against the required duty

Vendor inspections, assembly tests and site verification have different scopes. Operating conditions, expected results, documents and the handling of deviations are agreed before acceptance.

A scope you can specify.

Inputs that matter.

  • Duty, required output and operating modes.
  • Media, utilities and available infrastructure.
  • Layout and boundaries of adjacent equipment.
  • Document status and mandatory technical requirements.
  • Target schedule and acceptance criteria.
Prepare your brief →

Outputs and acceptance.

  • Concept and technical-interface register.
  • Documents for equipment selection and procurement.
  • Execution, verification and handover plan.

The actual scope and acceptance criteria depend on the application and contract.

From the project portfolio.

All projects ↗
Project photograph.

Project 674 · Process plant upgrades

Vacuum system replacement

Location: Rybitví, Czechia · 2024

New vacuum assembly with PP tanks, heat exchangers, piping, instrumentation and controls.

Broader project portfolioProcess equipment refurbishment and installation

2 independent vacuum trainsDetails →
Project photograph.

Project 692 · Process plant upgrades

Stainless steel tank with agitator

Installation location: Přerov, Czechia · 2024

A grade 1.4571 tank with an internal diameter of 1,950 mm, supplied in two sections and welded together during installation.

Broader project portfolioFabrication, installation and supply of a tank with agitator

1 tank with an agitatorDetails →
Project photograph.

Project 667 · Process plant upgrades

Acidification reactor replacement

Installation location: Lovosice, Czechia · 2024

Replacement of a 3.9 m³ reactor on a +6 m platform, including agitator assembly and modification of 15 pipe runs.

Broader project portfolioEquipment replacement, installation and connection

1 reactor with a volume of 3.9 m³Details →

Expertise for this application.

Questions that shape the project.

Do we need a completed design?

No. Initial assessment can start from the need and available information. Missing inputs and required surveys are identified during preparation.

Does turnkey automatically include everything?

The agreed supply boundary decides. Civil works, permits, process licences, utilities and operating trials need expressly allocated responsibilities.

A clear brief.
A practical next step.

Send your drawings, operating parameters or a short description of the change you need. We will review the technical interfaces and propose the next steps towards a quotation, clarifying any missing information with you.

Discuss your requirements ↗Prepare a technical brief →+420 731 771 147info@emkoproject.cz